Description
SURFACE PREPARATION AND USE:
- Clean the surface for oil, laitance and loose particles. See The surface is fully dried. The surface should be clean and dry before application. Before application ensure that the new concrete is cured minimum for 90 days.
- Apply clean primer (ECP-99) on the clean surface and let It dry for 24 hours.
- Stir 2 parts of A with 3 parts of C till uniform consistency is obtained than add one part of B(Hardner) to the uniform mix slowly. apply within 15 minutes
- Apply top coat: : EPW-99 after 72 hours.




Reviews
There are no reviews yet.